Monday, 8 February 2010

Directing and Director's call

When Director is getting ready to start He'll ask the Floor manager if the floor is ready. the floor manager will reply by seeing floor ready thwen he'll check if sound is ready the sound operator will reply sound ready. The director will follow the script unless the script says 'Direct as Ad Lib' the director will decide what will be used what are shots are used, Before the director change the shot he will Cut to Camera Number (Number of camera that filming the shot he needs) then he'll say cut at this moment the vision mixer will press the number on vision mixing desk to change whats being on soon. When the director what to switich to a VT he'll say Cut to VT.

No comments:

Post a Comment